§ 50.05 CONSTRUCTION PLANS TO INCLUDE LOCATION OF GAS LINES AND MAINS.
   Plans for construction work, which include excavation or trenching, shall include the general location of all natural gas service lines and mains which cross the construction nor are located within ten feet of the outer limits of the proposed trenching or excavation.
('74 Code, § 27-191) (Ord. 1069, passed 7-19-88)