§ 153.40 GENERAL STANDARDS.
   In all special flood hazard areas and in all areas bounded by flood of record contours the following provisions are required.
   (A)   All new construction and substantial improvements shall be designed (or modified) and adequately anchored to prevent flotation, collapse, and lateral movement of the structure.
   (B)   All new construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage.
   (C)   All new construction and substantial improvements shall be constructed by methods and practices that minimize flood damages.
   (D)   Electrical, heating, ventilation, plumbing, air conditioning equipment, and other service facilities shall be designed and/or located so as to prevent water from entering or accumulating within the components during conditions of flooding. These include, but are not limited to, HVAC equipment, water softener units, bath/kitchen fixtures, ductwork, electric/gas meter panels/boxes, utility/cable boxes, appliances (washers, dryers, refrigerators, freezers, and the like), hot water heaters, and electric outlets/switches.
   (E)   All new and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system.
   (F)   New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters.
   (G)   On-site waste disposal systems shall be located and constructed to avoid impairment to them or contamination from them during flooding.
   (H)   Any alteration, repair, reconstruction, or improvements to a structure, which is in compliance with the provisions of this chapter, shall meet the requirements of new construction as contained in this chapter.
   (I)   Nothing in this chapter shall prevent the repair, reconstruction, or replacement of a building or structure existing on the effective date of this chapter and located totally or partially within the floodway, non-encroachment area, or stream setback, provided there is no additional encroachment below the regulatory flood protection elevation in the floodway, non-encroachment area, flood of record contour or stream setback, and provided that such repair, reconstruction, or replacement meets all of the other requirements of this chapter.
   (J)   New solid waste disposal facilities and sites, hazardous waste management facilities, salvage yards, and chemical storage facilities shall not be permitted, except by variance as specified in § 153.29(J). A structure or tank for chemical or fuel storage incidental to an allowed use or to the operation of a water treatment plant or wastewater treatment facility may be located in a special flood hazard area only if the structure or tank is either elevated or flood-proofed to at least the regulatory flood protection elevation and certified according to § 153.26(C).
   (K)   New critical facilities shall not be permitted, except by variance, as specified in § 153.29(J).
   (L)   All subdivision proposals and other development proposals shall be consistent with the need to minimize flood damage.
   (M)   All subdivision proposals and other development proposals shall have public utilities and facilities such as sewer, gas, electrical, and water systems located and constructed to minimize flood damage.
   (N)   All subdivision proposals and other development proposals shall have adequate drainage provided to reduce exposure to flood hazards.
   (O)   All subdivision proposals and other development proposals shall have received all necessary permits from those governmental agencies for which approval is required by federal or state law, including § 404 of the Federal Water Pollution Control Act Amendments of 1972, being 33 U.S.C. § 1334.
(Ord. passed 11-16-1989; Ord. passed 1-20-1994; Ord. passed 9-18-2006) Penalty, see § 153.99