§ 152.406 DEFINITIONS.
   For the purpose of this subchapter, the following definitions shall apply unless the context clearly indicates or requires a different meaning. Unless specifically defined below, words or phrases used in this subchapter shall be interpreted so as to give such words or phrases the meaning they have in common usage, and to provide this subchapter the most reasonable application.
   ACCESSORY STRUCTURE (APPURTENANT STRUCTURE). A structure located on the same parcel of property as the principal structure and the use of which is incidental to the use of the principal structure. Garages, carports and storage sheds are common urban ACCESSORY STRUCTURES. Pole barns, hay sheds and the like quality as accessory structures on farms, and may or may not be located on the same parcel as the farm dwelling or shop building.
   ADDITION (TO AN EXISTING BUILDING). An extension or increase in the floor area or height of a building or structure.
   APPEAL. A request for a review of the Floodplain Administrator’s interpretation of any provision of this chapter.
   AREA OF SHALLOW FLOODING. A designated Zone AO on the town’s Flood Insurance Rate Map (FIRM) with base flood depths determined to be from one to three feet. These areas are located where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident.
   AREA OF SPECIAL FLOOD HAZARD. See SPECIAL FLOOD HAZARD AREA (SFHA).
   BASEMENT. Any area of the building having its floor subgrade (below ground level) on all sides.
   BASE FLOOD. The flood having a 1% chance of being equaled or exceeded in any given year.
   BASE FLOOD ELEVATION (BFE). A determination of the water surface elevations of the base flood as published in the Flood Insurance Study. When the BFE has not been provided in a special flood hazard area, it may be obtained from engineering studies available from a federal or state other source using FEMA approved engineering methodologies. This ELEVATION, when combined with the freeboard, establishes the regulatory flood protection elevation.
   BUILDING. See STRUCTURE.
   CHEMICAL STORAGE FACILITY. A building, portion of a building, or exterior area adjacent to a building used for the storage of any chemical or chemically reactive products.
   CRITICAL FACILITY. Any property that, if flooded, would result in severe consequences to public health and safety. CRITICAL FACILITIES include but are not limited to:
      (1)   Hospitals, nursing homes, and housing likely to contain occupants who may not be sufficiently mobile to avoid death or injury during a flood;
      (2)   Police stations, fire stations, vehicle and equipment storage facilities, and emergency operations centers that are needed for flood response activities before, during, and after a flood; and
      (3)   Public and private utility facilities that are vital to maintaining or restoring normal services to flooded areas before, during, and after a flood.
   DEVELOPMENT. Any human-made change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging, filling, grading, paving, excavation or drilling operations, or storage of equipment or materials.
   DISPOSAL. As defined in G.S. § 130A-290, the discharge, deposit, injection, dumping, spilling, leaking, or placing of any solid waste into or on any land or water so that the solid waste or any constituent part of the solid waste may enter the environment or be emitted into the air or discharged into any waters, including groundwater.
   ELEVATED BUILDING. A non-basement building which has its lowest elevated floor raised above ground level by foundation walls, shear walls, posts, piers, pilings, or columns.
   ENCROACHMENT. The advance or infringement of uses, fill, excavation, buildings, permanent structures or development into a floodplain, which may impede or alter the flow capacity of a floodplain.
   EXISTING MANUFACTURED HOME PARK OR MANUFACTURED HOME SUBDIVISION. A manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) was completed before the November 16, 1989, the original effective date of the floodplain management regulations adopted by the town.
   FLOOD or FLOODING. A general and temporary condition of partial or complete inundation of normally dry land areas from:
      (1)   The overflow of inland or tidal waters; and/or
      (2)   The unusual and rapid accumulation of runoff of surface waters from any source.
   FLOOD BOUNDARY AND FLOODWAY MAP (FBFM). An official map of a community, issued by the Federal Emergency Management Agency, on which the special flood hazard areas and the floodways are delineated. This official map is a supplement to and shall be used in conjunction with the FLOOD INSURANCE RATE MAP (FIRM).
   FLOOD INSURANCE. The insurance coverage provided under the National Flood Insurance Program.
   FLOOD INSURANCE RATE MAP (FIRM). An official map of a community, issued by the Federal Emergency Management Agency, on which both the special flood hazard areas and the risk premium zones applicable to the community are delineated.
   FLOOD INSURANCE STUDY (FIS). An examination, evaluation, and determination of flood hazards, corresponding water surface elevations (if appropriate), flood hazard risk zones, and other flood data in a community issued by the Federal Emergency Management Agency. The FLOOD INSURANCE STUDY report includes Flood Insurance Rate Maps (FIRMs) and Flood Boundary and Floodway Maps (FBFMs), if published.
   FLOOD OF RECORD CONTOUR. The boundary of the additional area outside of the area of special flood hazard that would be inundated if floodwaters rise to the flood of record elevation.
   FLOOD-PRONE AREA. See FLOODPLAIN.
   FLOOD OF RECORD ELEVATION. The peak elevation of the water surface above mean sea level recorded during an historic flood, where the recorded elevation exceeds the base flood elevation.
   FLOODPLAIN. Any land area susceptible to being inundated by water from any source.
   FLOODPLAIN ADMINISTRATOR. The individual appointed to administer and enforce the floodplain management regulations.
   FLOODPLAIN DEVELOPMENT PERMIT. Any type of permit that is required in conformance with the provisions of this subchapter, prior to the commencement of any development activity.
   FLOODPLAIN MANAGEMENT. The operation of an overall program of corrective and preventive measures for reducing flood damage and preserving and enhancing, where possible, natural resources in the floodplain, including, but not limited to, emergency preparedness plans, flood control works, floodplain management regulations, and open space plans.
   FLOODPLAIN MANAGEMENT REGULATIONS. This subchapter and other zoning ordinances, subdivision regulations, building codes, health regulations, special purpose ordinances, and other applications of police power which control development in flood-prone areas. This term describes federal, state or local regulations, in any combination thereof, which provide standards for preventing and reducing flood loss and damage.
   FLOOD-PROOFING. Any combination of structural and nonstructural additions, changes, or adjustments to structures, which reduce or eliminate flood damage to real estate or improved real property, water and sanitation facilities, structures, and their contents.
   FLOODWAY. The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot.
   FLOOD ZONE. A geographical area shown on a flood hazard boundary map or flood insurance rate map that reflects the severity or type of flooding in the area.
   FREEBOARD. The height added to the base flood elevation (BFE) to account for the many unknown factors that could contribute to flood heights greater that the height calculated for a selected size flood and floodway conditions, such as wave action, bridge openings, and the hydrological effect of urbanization on the watershed. The base flood elevation plus the FREEBOARD establishes the regulatory flood protection elevation.
   FUNCTIONALLY DEPENDENT FACILITY. A facility which cannot be used for its intended purpose unless it is located in close proximity to water, such as a docking or port facility necessary for the loading and unloading of cargo or passengers, shipbuilding, or ship repair. The term does not include long-term storage, manufacture, sales, or service facilities.
   HAZARDOUS WASTE FACILITY. As defined in G.S. Ch. 130A, Art. 9, a facility for the collection, storage, processing, treatment, recycling, recovery, or disposal of hazardous waste.
   HIGHEST ADJACENT GRADE (HAG). The highest natural elevation of the ground surface, prior to construction, immediately next to the proposed walls of the structure.
   HISTORIC STRUCTURE. Any structure that is:
      (1)   Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of Interior as meeting the requirements for individual listing on the National Register;
      (2)   Certified or preliminarily determined by the Secretary of Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district;
      (3)   Individually listed on a local inventory of historic; landmarks in communities with a certified local government (CLG) Program; or
      (4)   Certified as contributing to the historical significance of a historic district designated by a community with a certified local government (CLG) program. Certified local government (CLG) programs are approved by the U.S. Department of the Interior in cooperation with the state’s Department of Cultural Resources through the state’s Historic Preservation Officer as having met the requirements of the National Historic Preservation Act of 1966 as amended in 1980.
   LOWEST ADJACENT GRADE (LAG). The elevation of the ground, sidewalk or patio slab immediately next to the building, or deck support, after completion of the building.
   LOWEST FLOOR. The lowest floor of the lowest enclosed area (including basement). An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access, or limited storage in an area other than a basement area is not considered a building’s LOWEST FLOOR, provided that such an enclosure is not built so as to render the structure in violation of the applicable non-elevation design requirements of this subchapter.
   MANUFACTURED HOME. A structure, transportable in one or more sections, which is built on a permanent chassis and designed to be used with or without a permanent foundation when connected to the required utilities. The term MANUFACTURED HOME does not include recreational vehicles.
   MANUFACTURED HOME PARK OR SUBDIVISION. A parcel (or contiguous parcels) of land divided into two or more manufactured home lots for rent or sale.
   MARKET VALUE. The building value, not including the land value and that of any accessory structures or other improvements on the lot. MARKET VALUE may be established by independent certified appraisal; replacement cost depreciated for age of building and quality of construction (actual cash value); or adjusted tax assessed values.
   MEAN SEA LEVEL. The National Geodetic Vertical Datum (“NGVD”) as corrected in 1929, the North American Vertical Datum (“NAVD”) as corrected in 1988, or other vertical control datum used as a reference for establishing varying elevations within the floodplain, to which base flood elevations (BFEs) shown on a FIRM are referenced. Refer to each FIRM panel to determine datum used.
   NEW CONSTRUCTION. Structures for which the start of construction commenced on or after the effective date of the original version of the community’s flood damage prevention ordinance and includes any subsequent improvements to such structures.
   NON-ENCROACHMENT AREA. The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than one foot as designated in the flood insurance study report.
   POST-FIRM. Construction or other development for which the start of construction occurred on or after the effective date of the initial flood insurance rate map for the area.
   PRE-FIRM. Construction or other development for which the start of construction occurred before the effective date of the initial flood insurance rate map for the area.
   PRINCIPALLY ABOVE GROUND. At least 51% of the actual cash value of the structure is above ground.
   PUBLIC SAFETY AND/OR NUISANCE. Anything which is injurious to the safety or health of an entire community or neighborhood, or any considerable number of persons, or unlawfully obstructs the free passage or use, in the customary manner, of any navigable lake, or river, bay, stream, canal, or basin.
   RECREATIONAL VEHICLE (also known as RV, FIFTH WHEEL). A vehicle, which is:
      (1)   Built on a single chassis;
      (2)   Four hundred square feet or less when measured at the largest horizontal projection;
      (3)   Designed to be self-propelled or permanently towable by a light duty truck; and
      (4)   Designed primarily not for use as a permanent dwelling, but as temporary living quarters for recreational, camping, travel, or seasonal use. This definition includes vehicles such as travel trailers, motor homes, and campers.
   REFERENCE LEVEL. The bottom of the lowest horizontal structural member of the lowest floor, excluding the foundation system, for structures within all special flood hazard areas.
   REGULATORY FLOOD PROTECTION ELEVATION. The base flood elevation plus the freeboard. In special flood hazard areas where base flood elevations (BFEs) have been determined, this elevation shall be the EFE plus two feet of freeboard. In special flood hazard areas where no BFE has been established, this ELEVATION shall be at least three feet above the highest adjacent grade.
   REMEDY A VIOLATION. To bring the structure or other development into compliance with state and community floodplain management regulations, or, if this is not possible, to reduce the impacts of its noncompliance. Ways that impacts may be reduced include protecting the structure or other affected development from flood damages, implementing the enforcement provisions of this chapter or otherwise deterring future similar violations, or reducing federal financial exposure with regard to the structure or other development.
   RIVERINE. Relating to, formed by, or resembling a river (including tributaries), stream, brook, and the like.
   SALVAGE YARD. Any nonresidential property used for the storage, collection, and/or recycling of any type of equipment, and including but not limited to vehicles, appliances, and related machinery.
   SOLID WASTE DISPOSAL FACILITY. As defined in G.S. § 130A-290(a)(35), any facility involved in the disposal of solid waste.
   SOLID WASTE DISPOSAL SITE. As defined in G.S. § 130A-290(a)(36), any place at which solid wastes are disposed of by incineration, sanitary landfill, or any other method.
   SPECIAL FLOOD HAZARD AREA (SFHA). The land in the floodplain subject to a 1% or greater chance of being flooded in any given year, as determined in § 152.407.
   START OF CONSTRUCTION.
      (1)   Includes substantial improvement, and means the date the building permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement, or other improvement was within 180 days of the permit date.
      (2)   The actual START means either the first placement of permanent construction of a structure on a site, such as the pouring of slab or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation.
      (3)   Permanent construction does not include land preparation, such as clearing, grading, and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers, or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or not part of the main structure.
      (4)   For a substantial improvement, the actual START OF CONSTRUCTION means the first alteration of any wall, ceiling, floor, or other structural part of the building, whether or not that alteration affects the external dimensions of the building.
   STRUCTURE. A walled and rooted building, a manufactured home, or a gas, liquid, or liquefied gas storage tank that is principally above ground.
   SUBSTANTIAL DAMAGE. Damage of any origin sustained by a structure during any one-year period whereby the cost of restoring the structure to its before damaged condition would equal or exceed 50% of the market value of the structure before the damage occurred. See definition of “substantial improvement.” SUBSTANTIAL DAMAGE also means flood-related damage sustained by a structure on two separate occasions during a ten-year period for which the cost of repairs at the time of each such flood event, on the average, equals or exceeds 25% of the market value of the structure before the damage occurred.
   SUBSTANTIAL IMPROVEMENT. Any combination of repairs, reconstruction, rehabilitation, addition, or other improvement of a structure, taking place during any one-year period for which the cost equals or exceeds 50% of the market value of the structure before the start of construction of the improvement. This term includes structures which have incurred substantial damage, regardless of the actual repair work performed. The term does not, however, include either:
      (1)   Any correction of existing violations of state or community health, sanitary, or safety code specifications which have been identified by the community’s Code Enforcement Official and which are the minimum necessary to assure safe living conditions; or
      (2)   Any alteration of a historic structure, provided that the alteration will not preclude the structure’s continued designation as a historic structure.
   VARIANCE. A grant of relief from the requirements of this subchapter.
   VIOLATION. The failure of a structure or other development to be fully compliant with the community’s floodplain management regulations. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in §§ 152.408 and 152.409 is presumed to be in VIOLATION until such time as that documentation is provided.
   WATER SURFACE ELEVATION (WSE). The height, in relation to mean sea level, of floods of various magnitudes and frequencies in the floodplains of coastal or riverine areas.
   WATERCOURSE. A lake, river, creek, stream, wash, channel or other topographic feature on or over which waters flow at least periodically. WATERCOURSE includes specifically designated areas in which substantial flood damage may occur.
   ZONES. This subchapter references zones A, AE, AO, and A1-30. These ZONES are FEMA designations, and as such, these ZONES only relate to this subchapter. The following definitions are from FEMA’s website.
      (1)   ZONE A. Areas subject to inundation by the 1% annual chance flood event generally determined using approximate methodologies. Because detailed hydraulic analyses have not been performed, no base flood elevations (BFEs) or flood depths are shown. Mandatory flood insurance purchase requirements and floodplain management standards apply.
      (2)   ZONE AE AND A1-30. Areas subject to inundation by the 1% annual chance flood event determined by detailed methods. Base flood elevations (BFEs) are shown. Mandatory flood insurance purchase requirements and floodplain management standards apply.
      (3)   AO. Areas subject to inundation by 1% annual chance shallow flooding (usually sheet flow on sloping terrain) where average depths are between one and three feet. Average flood depths derived from detailed hydraulic analyses are shown in this zone. Mandatory flood insurance purchase requirements and floodplain management standards apply.
(Ord. passed 12-20-2001)