(A) Whenever a developer installs or causes to be installed any utility line(s) in any public right-of-way, the developer shall, as soon as practicable after installation is complete and before acceptance of any water or sewer line, furnish the town with a copy of a drawing that shows the exact location of such utility line(s).
(B) Such drawings must be verified as accurate by the utility service provider.
(C) Compliance with this requirement shall be a condition of the continued validity of the permit authorizing such development.
(Ord. passed 12-20-2001) Penalty, see § 152.999