(A) A permit shall be obtained before beginning construction, alteration or repair of any building or structure, using forms furnished by the Building Commissioner, whenever the scope of the work equals or exceeds the following:
(1) Work on an electrical panel or subpanel, where there may be a change of 10% or more in load on any panel or subpanel.
(2) Plumbing work, where a contractor is hired and which involves a change of 10% or more in any plumbing lines to the structure.
(3) Foundation or structural work, all (no exemptions).
(4) Roofing work, where the repairs will cover 10% or more of the affected roof surface.
(B) All fees required by this chapter shall be paid to the City Clerk-Treasurer.
(Ord. 2-1991, passed 2-4-91; Am. Ord. 8, 2018, passed 3-5-18)