1057.12 COMPLETION OF SWP3.
   The site operator shall schedule a site inspection with the City within ten (10) days of reaching final stabilization and prior to removing perimeter sediment controls at the site. The site inspection with the City shall occur prior to filing a Notice of Termination (NOT) with Ohio EPA under the Construction General Permit. Failure to conduct a final site inspection with the City may result in enforcement and/or imposition of penalties under Section 1057.16 and 1057.99.
(Ord. 59-2017. Passed 6-6-17.)