1240.06 SUBMITTAL AND REQUEST FOR QUALIFICATION.
   (a)   Any person owning or controlling land in the City may make application for consideration of a Planned Unit Development. Such application shall be made by submitting a request for a preliminary determination as to whether or not a parcel qualifies for the PUD option.
   (b)   A request shall be submitted to the City. The submission shall include the information required by subparagraph (c) below.
   (c)   Based on the documentation submitted, the Planning Commission shall make a preliminary determination as to whether or not a parcel qualifies for the PUD option under the provisions of Section 1240.03 (Criteria for Qualification). The submittal must include the following:
      (1)   Substantiation that the criteria set forth in Section 1240.03 are or will be met.
      (2)   A schematic land use plan containing enough detail to explain the function of open space; the location of land use areas, streets providing access to the site, pedestrian and vehicular circulation within the site; dwelling unit density and types; and buildings or floor areas contemplated, as applicable.
      (3)   A plan for the protection of natural features or preservation of open space or greenbelts.
      (4)   The Planning Commission shall review the applicant’s request for qualification. If approved, the applicant may then proceed to prepare a PUD Plan upon which a final determination will be determined.
         (Ord. 24-2006. Passed 3-7-06.)