(a) If a Comprehensive Stormwater Management Plan is required by this regulation, soildisturbing activities shall not be permitted until a cash bond of 5% of the total project cost has been deposited with the Village of Perry Finance Department. This bond shall be posted for the Village of Perry to perform the obligations otherwise to be performed by the owner of the development area as stated in this regulation and to allow all work to be performed as needed in the event that the applicant fails to comply with the provisions of this regulation. The storm water bond will be returned, less Village of Perry administrative fees as detailed in Chapter 555 of the Village of Perry Codified Ordinances, when the following three criteria are met:
(1) After 80% of the lots of the project have been complete or 100% of the total project has been permanently stabilized or three (3) years from the time of permanent stabilization have passed.
(2) An As-Built Inspection of all stormwater control measures as described in 555.12 is approved by the Village Engineer.
(3) An Inspection and Maintenance Plan has been approved by the Village of Perry and Inspection and Maintenance Agreement has been signed by the developer, the contractor, the Village of Perry, and the private owner or homeowners association who will take long term responsibility for these SCMs, is accepted by the Village Engineer.
(b) Once these criteria are met, the applicant shall be reimbursed all bond monies that were not used for any part of the project. If all of these criteria are not met after three years of permanent stabilization of the site, the Village of Perry may use the bond monies to fix any outstanding issues with all storm water management structures on the site and the remainder of the bond shall be given to the private lot owner/ homeowners association for the purpose of long term maintenance of the project.
(Ord. 2016-29. Passed 11-10-16.)