Prior to commencing work, the permit holder shall be responsible for having all utilities, including cable, electric, telephone, water, gas and steam service, for each structure shut off and utility lines removed from the building in accordance with the requirements of this chapter and the utility companies involved. All sewer connections from the demolished structure shall be bulkheaded at a point specified by the Village Engineer. It is the responsibility of the permit holder to secure the presence of an inspector/representative from the Village Engineer's office at the time of bulkheading the sewer connections. Any damage done to any curb, sidewalk or pavement, water connections, gas mains, telephone ducts, power ducts or any public utility not mentioned, in the street's right of way during the sewer connection bulkheading operation, is the responsibility of the permit holder and must be replaced or repaired at no cost to the Village. Any repair or replacement of the above-mentioned items must be done to the satisfaction of the respective utility and the Village. (Ord. 2010-07. Passed 10-14-10.)