8-4-13: PLUMBING CODE REQUIREMENTS:
A.   Construction: The size, slope, alignment, materials of construction of a building sewer, and the methods to be used in excavating, placing of the pipe, jointing, testing and backfilling the trench, shall all conform to the requirements of the international plumbing code. (2010 Code § 19-47; amd. 2012 Code)
B.   Connection: The connection of the building sewer into the public sewer shall conform to the requirements of the international plumbing code. (2010 Code § 19-50; amd. 2012 Code)