1510.07 COMPLIANCE WITH STATE AND FEDERAL REGULATIONS.
   Approvals issued in accordance with this regulation do not relieve the owner of responsibility for obtaining all other necessary permits and/or approvals from other federal, state, and/or county agencies. If requirements vary, the most restrictive shall prevail. These permits may include, but are not limited to, those listed below. Owners are required to show proof of compliance with these regulations before the City of Pepper Pike will issue a building or zoning permit.
   (a)   Ohio Environmental Protection Agency (Ohio EPA) National Pollutant Discharge Elimination System (NPDES) Permits authorizing stormwater discharges associated with construction activity or the most current version thereof: Proof of compliance with these requirements shall be the owner's Notice of Intent (NOI) number from Ohio EPA, a copy of the Ohio EPA Director's Authorization Letter for the NPDES Permit, or a letter from the site owner certifying and explaining why the NPDES Permit is not applicable.
   (b)   Section 401 of the Clean Water Act: Proof of compliance shall be a copy of the Ohio EPA Water Quality Certification application, public notice, project approval, or a letter from the site owner certifying that a qualified professional wetland consultant has surveyed the site and found no waters of the United States. Wetlands, and other waters of the United States, shall be delineated by protocols accepted by the U.S. Army Corps of Engineers at the time an application is made under this regulation.
   (c)   Ohio EPA Isolated Wetland Permit: Proof of compliance shall be a copy of Ohio EPA's Isolated Wetland Permit application, public notice, project approval, or a letter from the site owner certifying that a qualified professional wetland consultant has surveyed the site and found no waters of the United States. Isolated wetlands shall be delineated by protocols accepted by the U.S. Army Corps of Engineers at the time an application is made under this regulation.
   (d)   Section 404 of the Clean Water Act: Proof of compliance shall be a copy of the U.S. Army Corps of Engineers Individual Permit application, public notice, or project approval. If an Individual Permit is not required, the site owner shall submit proof of compliance with the U.S. Army Corps of Engineer's Nationwide Permit Program. Proof of compliance shall include the following:
      (1)   A letter from the site owner certifying that a qualified professional wetland consultant has surveyed the site and determined that Section 404 of the Clean Water Act is not applicable.
      (2)   A site plan showing that any proposed fill of waters of the United States conforms to the general and special conditions specified in the applicable Nationwide Permit. Wetlands, and other waters of the United States, shall be delineated by protocols accepted by the U.S. Army Corps of Engineers at the time of application of this regulation.
   (e)   Ohio Dam Safety Law: Proof of compliance shall be a copy of the ODNR Division of Soil and Water Resources permit application tracking number, a copy of the project approval letter from the ODNR Division of Soil and Water Resources, or a letter from the site owner certifying and explaining why the Ohio Dam Safety Law is not applicable.
(Ord. 2017-36. Passed 11-15-17.)