1276.02 PORTABLE, ON-DEMAND STORAGE DEVICES (“POD”).
   (a)    Permit Required. No POD shall be constructed, erected, or placed upon any residential property without first obtaining a permit from the Inspector of Buildings m accordance with Chapter 1444 , Permits.
 
   (b)    Fee. The fee for a permit for a POD shall be submitted with the application.
 
   (c)    Application requirements. Applications for a permit for a POD shall be in writing on forms provided by the Inspector of Buildings and shall include the following:
      (1)    Description of the POD, including the size and dimension; and
      (2)    A development plan to scale showing the location of the POD and compliance with the regulations in this Chapter.
 
   (d)    Restrictions. All PODs shall comply with the following:
      (1)    A permit for a POD shall be valid for a period of sixty (60) days and shall authorize the construction, erection or placement on the property described in the application.
      (2)    PODs are only permitted on a lot containing an existing residential dwelling or a residential dwelling under construction/renovation/repair, where a valid building permit has been issued when applicable.
      (3)    Only one (1) POD shall be placed on a lot at one time.
      (4)   PODs shall be located on a paved area or gravel area unless located on a residential construction project where a driveway is not yet installed, in which case the POD shall be located in the proposed driveway location.
      (5)    PODs shall be located entirely on the owner's lot, and when applicable, as close to the residence as possible, not blocking any sight lines.
      (6)    No part of any POD shall be located on any public property or in the right- of- way.
      (7)    Any POD constructed, erected or placed upon property shall comply with all applicable provisions of the Codified Ordinances of the City of Pepper Pike.
 
   (e)    Renewal. A permit for a POD may be renewed one time for an additional sixty (60) days provided that the applicant has complied with the requirements of this Chapter and pays the applicable renewal fee. (Ord. 2015-09. Passed 5-20-15.)