Whenever any construction activities occur within a public road right-of-way, traffic control devices shall be placed in accordance with INDOT Standards and the Manual on Uniform Traffic Control Devices, Part VI. The devices shall be installed prior to any construction and shall be maintained during the entire time that the special conditions exist. They shall be removed immediately thereafter.
(Ord. 1999-06, passed 6-8-99)