All proposed new development shall be reviewed to determine that:
(A) Such proposals are consistent with the need to minimize flood damage and will be reasonably safe from flooding;
(B) All public utilities and facilities such as sewer, gas, electric, communications, and water systems are located and constructed to minimize or eliminate flood damage; and
(C) Adequate drainage is provided to reduce exposure to flood hazards; in Zones AH and AO, adequate drainage paths shall be provided to guide floodwaters around and away from proposed structures.
(Ord. 1775, passed 5-7-14)