§ 152.100 MINIMUM REQUIREMENTS.
   All proposed new development shall be reviewed to determine that:
   (A)   Such proposals are consistent with the need to minimize flood damage and will be reasonably safe from flooding;
   (B)   All public utilities and facilities such as sewer, gas, electric, communications, and water systems are located and constructed to minimize or eliminate flood damage; and
   (C)   Adequate drainage is provided to reduce exposure to flood hazards; in Zones AH and AO, adequate drainage paths shall be provided to guide floodwaters around and away from proposed structures.
(Ord. 1775, passed 5-7-14)