§ 150.036 FINAL PLAT REQUIRED.
   The developer, having received approval of the preliminary plat/drawing of the proposed subdivision, shall submit a final plat of the subdivision and construction drawings and specifications of the improvements required therein. The final plat shall have incorporated all changes in the preliminary drawing required by the Planning Commission. Otherwise, it shall conform to the preliminary drawing, and it may constitute only that portion/phase of the approved preliminary drawing which the developer proposes to record and develop at the time. The final plat and any required supplementary information shall be prepared by a qualified engineer or surveyor.
(Ord. 1235, passed 7-16-2002)