922.10 CONTROL EQUIPMENT.
   (a)    The equipment installed to control FOG must be designed in accordance to plumbing codes, DEP and current engineering standards and approved by the Parkersburg Utility Board.
   (b)    Underground equipment shall be tightly sealed to prevent inflow of surface water and shall be easily accessible to allow regular maintenance and inspection.
   (c)    Control equipment shall be maintained by the owner/user of the facility to prevent a stoppage of the wastewater collection system and the accumulation of FOG material in the collection system lines, pumps and wastewater treatment plant.
   (d)    If the Parkersburg Utility Board is required to clean out the wastewater collection lines, as a result of the user’s poorly maintained control equipment, the owner/user shall be required to reimburse the control authority for all expenses including any fines that may be incurred due to any sanitary overflow due directly to the user’s discharge.
   (e)    The Parkersburg Utility Board retains the right to inspect and approve any and all installations of control equipment.
(Ord. 1395. Passed 6-14-11.)