1354.08 AMENDMENTS TO THE FINAL PLAT.
   Minor changes in the location, siting and height of buildings and structures may be authorized by the Planning Director without additional public hearings if required by engineering or other circumstances not foreseen at the time the final plat was approved. No change authorized by this section may cause any of the following:
   (a)    A change in use of any of the structures;
   (b)    An increase in overall coverage of the structures;
   (c)    An increase in the problems of traffic circulation or conflict with pedestrian walkways;
   (d)    A reduction in approved common open space;
   (e)    A reduction of off-street parking and loading space; or
   (f)    A reduction in required pavement widths.
   All other changes in use, or rearrangement of lots, blocks and building tracts, or any changes in the provision of common open space and changes other than those listed above, must be made by the Planning Commission after report of the Planning Director. Such changes may be made only if they are shown to be required by changes in conditions that have occurred since the final plat was approved. Any changes which are approved in the final plat must be recorded as amendments in accordance with the procedures established in Section 1307.03 of the Subdivision Regulations.
(Ord. 0-418. Passed 11-12-85.)