§ 155.046 CONSTRUCTION PROCEDURES.
   (A)   Permit required. A permit is required from the city prior to beginning any work in the city which affects erosion control, vegetation or tree removal, floodplain, grading, street construction, removal of existing structures, utility installation, and the like.
   (B)   Preconstruction conference. The City Engineer may require that all contractors participating in the construction meet for a preconstruction conference to discuss the project.
   (C)   Conditions prior to authorization. Prior to authorizing release of a construction permit, the City Engineer shall be satisfied that the following conditions have been met:
      (1)   The plat shall be approved by the Council;
      (2)   Initial erosion control measures and facilities shall be in place, as required by the subdivision regulations, SWPPP, City Administrator, and the City Engineer. All necessary off-site easements or dedications required for city maintained facilities shall be conveyed solely to the city, with proper signatures affixed;
      (3)   All contractors participating in the construction shall be presented with a set of approved plans bearing the city stamp stating “Release for Construction.” These plans shall remain on the job site at all times;
      (4)   A complete list of the contractors, their representatives on the site, and telephone numbers where a responsible party may be reached at all times must be submitted to the City Engineer and the City Administrator; and
      (5)   All applicable fees shall be paid to the city.
(Ord. 487, passed 7-18-2000; Am. Ord. 737, passed 7-20-2016) Penalty, see § 155.999