§ 41.206 DRAINAGE
   Stormwater handling facilities (inlet basins, culverts, pipe, retention areas, etc.) shall be designed such that stormwater drainage from the proposed construction to adjacent properties shall not exceed the pre-development stormwater discharge rate. The finished construction shall not create any adverse effect (erosion, flooding) on adjoining property owners. Design of drainage facilities shall be reviewed the City Engineer during the preliminary design stages.
(Ord. 95-2, passed 2-14-95)