1444.05 FEES.
   Fees for building permits are as follows:
   (a)   New Construction or Additions.
Category
Residential Accessory Buildings/Structures
Residential
Commercial
Industrial
Building
30¢/sq. ft.
65¢/sq. ft.
$2.32/sq. ft.
$2.32/sq. ft.
Plumbing
$20/fixture
$60 drain tile, $60 underfloor piping ($75 minimum)
$20/fixture, $60 drain tile, $60 underfloor piping ($75 minimum)
$20/fixture, $60 drain tile, $60 underfloor piping ($75 minimum)
$20/fixture, $60 drain tile, $60 underfloor piping ($75 minimum)
Electrical
$90/service or submain, plus $10/circuit
($75 minimum)
$90/service or submain, plus $10/circuit
($75 minimum)
$90/service or submain, plus $10/circuit
($75 minimum)
$90/service or submain, plus $10/circuit
($75 minimum)
HVAC
$1/1,000 BTU
$1/1,000 BTU
$1/1,000 BTU
$1/1,000 BTU
Swimming pools; except inflatable or moveable kiddie pools 36" deep or less
$350
Structures; such as fences, gates, walkways
$75
$75
$75
Construction water
$200 if needed
$200
$200
$200
Building plan review (non-refundable)
$60
$300
$300
$300
Accessory structure plan review
$60
$60
$60
Site improvement; except for one single-family home
5% of site improvement costs
5% of site improvement costs
5% of site improvement costs
5% of site improvement costs
Zoning Review Fee
(if a zoning review is requested by the applicant or required by the Community Development Director as part of the permitting process)
$75
$75
$75
$75
 
Note:   All fees shall be double for work started without permit per Village Code Section 210.03.
Note:   Any actual Village costs in excess of set fee amount is added to permit fee per Village Code Chapter 208.
   (b)   Remodeling of Existing Structures. In remodeling, where no square footage is added to the existing structure, the following permit fees shall apply, along with one-half the applicable plan review application fee set forth in subsection (a) hereof. For remodeling in which square footage is added, the fees shall be as set forth in subsection (a).
Category
Residential Accessory
Residential
Commercial
Industrial
Building
15¢/sq. ft.
35¢/sq. ft.
$1.16/sq. ft.
$1.16/sq. ft.
Plumbing
$20/fixture, $60 drain tile, $60 underfloor piping ($75 minimum)
$20/fixture, $60 drain tile, $60 underfloor piping ($75 minimum)
$20/fixture, $60 drain tile, $60 underfloor piping ($75 minimum)
$20/fixture, $60 drain tile, $60 underfloor piping ($75 minimum)
Electrical
$90/service or submain, plus $10 per circuit ($75 minimum)
$90/service or submain, plus $10 per circuit ($75 minimum)
$90/service or submain, plus $10 per circuit ($75 minimum)
$90/service or submain, plus $10 per circuit ($75 minimum)
HVAC
$1/1,000 BTU
$1/1,000 BTU
$1/1,000 BTU
$1/1,000 BTU
Structures; such as fences, gates, walkways
$75
$75
$75
Re-roofing
$75
$75
$75
$75
Building plan review (non-refundable)
$60
$300
$300
$300
Accessory structure plan review
$60
$60
$60
Site improvement; except for one single- family home
5% of site improvement costs
5% of site improvement costs
5% of site improvement costs
5% of site improvement costs
Zoning Review Fee
(if a zoning review is requested by the applicant or required by the Community Development Director as part of the permitting process)
$75
$75
$75
$75
 
Note:   All fees shall be double for work started without permit per Village Code Section 210.03.
Note:   Any actual Village costs in excess of set fee amount is added to permit fee per Village Code Chapter 208.
   (c)   Inspections. The fee for a building inspection, other than a plumbing or electrical inspection, shall be seventy-five dollars ($75.00). The fee for a plumbing or electrical inspection shall be one hundred dollars ($100.00). When a re-inspection is required, due to the previous inspection not being approved by the Village, the fees shall be one hundred twenty-five dollars ($125.00) for any such re-inspection.
      (Ord. 1986-28. Passed 8-11-86; Ord. 1998-11. Passed 4-27-98; Ord. 1998-22. Passed 7-13-98; Ord. 2000-14. Passed 5-8-00; Ord. 2001-35. Passed 8-27-01; Ord. 2005-43. Passed 12-12- 05; Ord. 2006-37. Passed 8-14-06; Ord. 2009-23. Passed 10-26-09; Ord. 2019-14. Passed 7-8-19.)