1046.06  FEES FOR CONNECTION PERMITS.
   A fee of seventy-five dollars ($75.00) shall be required for obtaining a connection permit for all hookups to the central water system.  In the event that a reinspection is required, an additional fee of twenty-five dollars ($25.00) will be charged.  These fees are exclusive of the cost of water meters and other connection charges.
(Ord. 1994-04.  Passed 3-28-94.)