1042.06 CONTRACTOR'S DUTIES.
   All private sewage disposal system contractors, when making an aerobic installation, shall include the electrical hookup unless specified to the contrary by the owner. Also, the owner shall receive ample instruction for the proper use of the system and its maintenance, and the system shall be tested by the installer to ensure its proper operation before acceptance.
(Ord. 1973-7. Passed 9-24-73.)