§ 153.057 INSPECTIONS.
    To ensure compliance, the Planning Director, Building Official or other duly authorized representative shall have the right to enter any premises for inspection purposes during reasonable hours.
   (A)   Foundation inspection. A foundation inspection is required of all permanent outdoor advertising displays constructed of block or brick or for which footings are required. Such inspections shall be made after trenches are excavated and any reinforcing steel is in place and prior to the placing of concrete. At no time shall concrete be poured without it being inspected and approved by the city.
   (B)   Setback inspection. A setback inspection is required of all signs, permanent and temporary. Setbacks shall be inspected at the time the foundation inspection is made for permanent signs and prior to the placing of concrete and after placement for temporary signs.
   (C)   Electrical inspection. An electrical inspection is required of all illuminated signs. All electrical work shall be done by a master licensed electrician. It shall be the responsibility of the electrician to call for the required inspection.
   (D)   Succeeding interval of inspections. Work shall not be done on any part of the sign installation beyond the point indicated in each successive inspection without first obtaining the approval of the Planning Director, Building Official or other duly authorized city official.
(Ord. 2016-07A, passed 8-9-2016; Ord. 2023-18-O, passed 12-5-2023)