Temporary electric service. The contractor must erect a temporary pole and appropriate meter box, circuit breaker panel and receptacles on the lot where the structure is being erected if the contractor wants the local electric utility company to provide electric service during construction. After the temporary electric facilities have been erected and inspected by the Building Inspector, the Building Inspector will advise the local electric utility company that the temporary electric facility for the proposed construction site is ready for service. It is the responsibility of the contractor to make application for service with the local electrical utility. Temporary electric service will be permitted at the construction site only during the initial six-month construction period allowed by the original permit. Extensions can be granted with Committee approval.
(Ord. 2015-3, passed 5-7-2015)