This plan must include the location, with respect to the structure floor plans, of all grade beams and piers (if required). Tops of foundations must be designed so that the top of the first floor level of the structure will be a minimum of eight inches above the adjacent finish ground level at a point around the perimeter of the slab. This plan must also include the location and specifications of all reinforcing steel and concrete. All foundation plans must be reviewed, signed and sealed by a Texas registered professional engineer.
(Ord. 2015-3, passed 5-7-2015)