(A) The city’s Water Service or designated agent shall make inspections as hereinafter required and either shall approve that portion of the work completed or shall notify the permittee wherein the work fails to comply with the Erosion and Sediment Control Plan as approved. Plans for grading, stripping, excavating and filling work bearing the stamp of approval of the city’s Water Service shall be maintained at the site during the progress of the work. To obtain inspections, the permittee shall notify the city’s Water Service at least two working days before the following:
(1) Start of construction;
(2) Installation of sediment and erosion measures;
(3) Completion of site clearing;
(4) Completion of rough grading;
(5) Completion of final grading;
(6) Close of the construction; and
(7) Completion of final landscaping.
(B) The permittee or his or her agent shall make regular inspections of all control measures in accordance with the inspection schedule outlined on the approved Erosion and Sediment Control Plan(s). The purpose of such inspections will be to determine the overall effectiveness of the control plan and the need for additional control measures. All inspections shall be documented in written form and submitted to the city’s Water Service at the time interval specified in the approved permit.
(C) The city’s Water Service or its designated agent shall enter the property of the applicant as deemed necessary to make regular inspections to ensure the validity of the reports filed under division (B) above.
(Ord. passed 7-26-2010)