(A) When a site plan on a single lot, tract or parcel of land is approved, any subdivision of or augmentation to the land assemblage included in the site plan must be resubmitted for the site plan review process as set forth in this chapter. Additionally, any changes to landscaping, traffic flow and accesses, utility requirements and/or the stormwater management plan shall require resubmittal for site plan review approval through the procedures set forth in this subchapter.
(B) Revisions and/or modifications to approved site development plans while under construction which do not increase the gross square footage of a building or adversely impact compliance with the approved site development plan, and would not alter the required infrastructure and improvements necessary to serve the site, may be approved in writing by the Mayor, upon review and recommendation by the town planner, Town Engineer or Chief Building Official provided the additions and/or modifications fully conform to all existing town regulations. Prior to final acceptance of the site, as-built drawings shall be submitted indicating the revisions and/or modifications prior to site acceptance.
(C) Changes in use shall be evaluated by the town planner or designee as to the need for a complete site development plan review and possible modifications, based on the nature of the change in use or occupancy and the need for compliance with current regulations. The following items shall be provided for review of a change of use:
(1) Type of business;
(2) Previous use;
(3) Hours of operation;
(4) Square footage of all structures; and
(5) Scaled drawing of the site and structure. Drawing to include:
(a) Parking (with dimensions) including handicapped spaces;
(b) Loading;
(c) Ingress/egress to the site;
(d) Traffic circulation pattern;
(e) Adjacent roadways;
(f) Dumpster location;
(g) Existing and proposed signage; and
(h) Any other information pertinent to the operation of the site.
(6) State accessibility standards for entrance and restrooms.
(D) Following receipt of the information noted above, the town planner or his or her designee shall have ten working days to provide his or her recommendation and determination as to whether a change in use will require a site development plan submittal. The applicant/petitioner shall be notified in writing of the town planner’s determination.
(Ord. 2002-03, passed 6-25-2002)