§ 157.139 APPLICATION REQUIREMENTS.
   (A)   Generally. The petitioner must submit seven copies of a site plan prepared, signed and sealed by an architect or professional engineer, licensed by the state, seven copies of a reduced site plan (minimum of 11 inches by 17 inches ), seven copies of boundary survey (of which three must be signed and sealed by a licensed surveyor), seven copies of an existing tree survey, seven copies of landscape plan proposed in accordance with the landscape regulations of the town, §§ 154.055 through 154.065, seven copies of traffic impact statement signed and sealed by a state registered professional engineer when determined to be needed by the town planning or engineering consultants, two complete copies of the stormwater management plan and calculations per SJRWMD or other town standards and a site plan review fee. An application that meets all of these requirements must be considered a sufficient application. Additionally, prior to issuance of a building permit, the petitioner must execute and record a stormwater maintenance agreement, as required by the code of ordinances of the town. In keeping with the requirements specified above, all site plans shall include the items listed in the required submittals check list as adopted by resolution by the Town Council. The required submittal checklist shall be made available in the office of the Town Clerk and/or town planning or engineering consultant.
   (B)   Pre-application conference. A pre-application conference can be requested by the applicant and is suggested in order to become aware of the town’s requirements. Site plans may be submitted as preliminary plans, in order to obtain a preliminary review prior to making expenditures on final engineering and construction documents. Preliminary plans at a minimum shall include: boundary survey, site layout, preliminary utility locations, ingress points, dimensions (setbacks, parking, aisles, buildings and the like); site data calculations; open space; retention areas and other information deemed necessary by the town for a particular use. Preliminary plans are required submittals for conditional use permit applications.
   (C)   Final site plans. Requests for final approval and issuance of a development order shall be made for final site plans containing all required information on the site, engineering, construction and permitting as described herein
(Ord. 2002-03, passed 6-25-2002)