(A) City permits. A city building permit shall be obtained for the construction of any pier, dock, or boathouse. A marina requires a conditional use permit through the Community Planning & Economic Development Department along with a building permit. No building permit application shall be deemed complete when filed, unless the following items are appended thereto:
(1) A survey prepared by a State of Florida registered land surveyor (showing the straight-line water frontage of the lot subject to the permit application, mean high or ordinary water lines, seawalls, bulkheads, property lines, and the width of waterway).
(2) Plans showing the height, width and length of all proposed structures to include pilings, boat lifts, platforms, pavilions, seawalls, detail and construction specifications and all other information deemed necessary by the Building Official to properly evaluate the plan. The design, construction, alteration and repair of the pier, dock or boathouse shall conform to the provisions of this chapter as amended or superseded from time to time. Pile dimensions, spacing and embedment shall be designed according to engineering practices.
(B) Federal and state permits. A dock permit and submerged land lease or exemption letter shall be obtained for all proposed construction of piers, docks, or boathouses from the St. Johns River Water Management District, Army Corps of Engineers, and the Florida Department of Environmental Protection.
(Ord. 2002-71, passed 11-21-02)