§ 201.265 PUMP STATION OPERATION AND REPAIR.
   (A)   All privately-owned collection and transmission system pump stations shall be operated in accordance with the rules and regulations outlined in Chapter 62-604, FAC. Equipment malfunctions and physical deficiencies identified during a sanitary sewer system inspection of a pump station shall be corrected and reported within seventy-two (72) hours after detection. If an equipment malfunction or a physical deficiency warrants extensive work be performed, a schedule of rehabilitation shall be submitted to the City within five (5) days of detection.
   (B)   If the system is unable to operate as intended, an alternative method of wastewater disposal shall be implemented immediately after approval of the City. All expenses associated with system rehabilitation or repair shall be the sole responsibility of the owner of the privately-owned collection and transmission system.
   (C)   In the event that the person responsible for the operation of the privately-owned collection and transmission system pump station determines that the pump station should be upgraded instead of repaired as in Subsection (A) above, a detailed schedule outlining the pump station upgrade shall be submitted to the City for approval within ten (10) days of the date of determination.
(Ord. 2013-15, passed 2-21-13)