§ 201.43 HAULED WASTEWATER.
   (A)   Septic tank waste may be introduced into the POTW only at locations designated by the Utilities Director, and at such times as are established by the Utilities Director. Such waste shall not violate the sections within subchapter ‘General Sewer Use Requirements’ of this chapter or any other requirements established by the City. The Utilities Director may require septic tank waste haulers to obtain individual wastewater discharge permits.
   (B)   The Utilities Director may require haulers of industrial waste to obtain individual wastewater discharge permits. The Utilities Director may require generators of hauled industrial waste to obtain individual wastewater discharge permits. The Utilities Director also may prohibit the disposal of hauled industrial waste. The discharge of hauled industrial waste is subject to all other requirements of this chapter.
   (C)   Industrial waste haulers may discharge loads only at locations designated outside of the City.
   (D)   Industrial waste haulers must provide a waste-tracking form for every load. This form shall include, at a minimum, the name and address of the industrial waste hauler, permit number, truck identification, names and addresses of sources of waste, and volume and characteristics of waste. The form shall identify the type of industry, known or suspected waste constituents, and whether any wastes are RCRA hazardous wastes.
(Ord. 2013-15, passed 2-21-13)