1135.20 HYDROGEOLOGIC STUDY.
   (a)   Upon the recommendation of the City Engineer, the City may require an applicant to prepare and submit a hydrogeologic study to indicate the degree of limitation and other soil properties which might adversely affect engineering and construction, especially with regard to the feasibility of constructing a basement and utilities.
   (b)   If adverse affects are found, a correction plan is required to be prepared by a professional engineer and submitted to the City Engineer for final review and approval.
   (c)   The City Engineer or designated representative has the authority to request the hydrogeologic study and to add appropriate conditions to the correction plan.
(Ord. 16-19. Passed 9-16-19.)