1137.13 CONSTRUCTION PROCEDURE AND MATERIALS.
   Improvements designed and constructed shall meet the standards outlined herein.
   (a)   Construction shall be performed under City supervision and inspection and shall be completed within the time fixed or agreed upon by the City Engineer.
   (b)   The minimum requirements for materials shall be in accordance with the standards of the current volume of "Construction and Material Specifications" of the Division of Highways of the Ohio Department of Transportation and the requirements of the Ohio Department of Health.
   (c)   All inspection costs for such improvements shall be the responsibility of the applicant.
(Ord. 16-19. Passed 9-16-19.)