1141.03 DETERMINATION OF AVERAGE SLOPE.
   The average slope for any hillside development shall be determined by the Planning Commission during the time of preliminary subdivision design. Determination will be on an area-by-area basis with each lot sized according to the average topographic change falling within each area.
(Ord. 16-19. Passed 9-16-19.)