§ 154.078 AS-BUILT SUBMITTAL REQUIREMENTS FOR THE CITY AND PAGE UTILITY ENTERPRISES.
   Following are the requirements for as-built drawings that must be provided to the City of Page and the Page Utility Enterprises, before any utility services can be provided to the site:
   (A)   As-builts shall be provided to the city and to Page Utility Enterprises in three different formats:
      (1)   A copy of the working drawing which is the approved site construction and utility plan with changes marked in red per these requirements.
      (2)   A paper copy with only the actual constructed utilities (not as-design utilities) shown on it stamped and signed by a registered Arizona engineer with the sheet labeled "as-built".
      (3)   An electronic AutoCAD file with only the actual constructed utilities (not as-design utilities).
   (B)   Contractor shall keep a working drawing onsite for viewing by the city/utilities at any time. The working drawing shall have all changes shown in red.
   (C)   When changes occur, such as pipe sizes, lengths, etc., a line or "X" shall be drawn through the changes with the actual installed size, material, quantity, etc. written next to the change. Improvements deleted in the field shall be crossed out with an "X" and labeled "not built" or "not installed". The following additional requirements shall be provided and shown on all as-builts:
      (1)   Provide exact details of changes or additional information, including but not limited to fabrication, erection, installation, location, sizing, material, dimensions, etc.
      (2)   Provide project control information, including coordinate system and vertical datum basis.
      (3)   Water systems shall show bends, valves, fire hydrants, blow-offs, air release valves, water meters, services, thrust blocks, etc. Pipes shall be labeled with the type of pipe, size, length and depth to top of pipe. Horizontal bend locations shall be determined by surveying, include coordinates on as-builts.
      (4)   Sewer systems shall show inverts in and out and lid elevations of manholes, cleanouts, services, lift stations, etc. Pipes shall be labeled with the type of pipe, size, length and slope. Inverts shall be determined by surveying.
      (5)   Storm drain systems shall show invert and grate/opening elevations and length of curb inlet for the catch basins. Pipes shall be labeled with type of pipe, size, length and slope. Inverts shall be determined by surveying.
      (6)   Electric utilities shall show the location of transformers, j-boxes, conduit, light poles, and the number of conduit and size shall be labeled on the drawing as well as any spare conduits.
      (7)   Gas/propane utility line location and size shall be shown on the as-builts.
      (8)   Cable and communication utility lines and size shall be shown on the as-builts.
      (9)   All existing and any new easements shall be shown on the paper and electronic as-builts.
      (10)   Any utility crossings shall be detailed with the depths and separation between utilities.
      (11)   Any changes or special situations that can't be shown clearly on the drawing shall be shown in a blown-up detail. Such as bends used to raise or lower a waterline.
      (12)   If utilities share the same trench, a cross section of the trench shall be provided.
   (D)   No utility services will be provided to the site or development until all as-builts are provided.
(Ord. 692-22, passed 5-11-2022)