901.07 CONSTRUCTION OF DRIVEWAYS.
   Any person desiring a driveway across the sidewalk into his premises shall first obtain from the Street Committee the application for curb breakage and driveway permit. The permit, if granted, shall specify the location of the driveway in relation to the frontage of the lot where located, the width of the curb breakage request, to be no more than 14 feet for a single car and 20 feet for a double car, the manner and materials for construction of such driveway, whether slag, concrete, asphalt or other approved material, will be used to designate the driveway, the time during which the sidewalk may be blocked for the construction. Such person shall cause that portion of the driveway which passes over or through the sidewalk to be paved with the same type of paving as the remainder of the sidewalk and shall further, when required by Street Committee, replace the curb stone that may be injured or destroyed by the use of construction of such driveway. All driveways and curb breakage and repair shall be completed within ninety days from issuance of the permit.
(Ord. 2002-7. Passed 6-3-02.)