§ 152.082 COMPENSATORY STORAGE.
   The water holding capacity of the floodplain, except those areas which are tidally influenced, shall not be reduced. Any reduction caused by filling, new construction or substantial improvements involving an increase in footprint to the structure, shall be compensated for by deepening and/or widening of the floodplain. Storage shall be provided on-site, unless easements have been gained from adjacent property owners; it shall be provided within the same hydraulic reach and a volume not previously used for flood storage; it shall be hydraulically comparable and incrementally equal to the theoretical volume of floodwater at each elevation, up to and including the 100-year flood elevation, which would be displaced by the proposed project. Compensatory storage can be provided off-site if approved by the municipality.
(Ord. passed 4-11-1991; Ord. passed 5-10-2010)