The Planning and Zoning Commission shall review subdivision proposals and other proposed new developments to assure that:
(A) All proposals are consistent with the need to minimize flood damage;
(B) All public utilities and facilities, such as sewer, gas, electrical and water systems are located, elevated and constructed to minimize or eliminate flood damage; and
(C) Adequate drainage is provided so as to reduce exposure to flood hazards.
(Res. passed 6-9-1975)