(A) Within six months, but no sooner than 30 days unless otherwise instructed by the Director of Public Works or his or her agent, the applicant shall make permanent repairs in the following manner. The applicant shall cut one foot beyond all sides of the patched area with a saw or pneumatically operated spade. The cut shall be vertical and in straight lines.
(B) After the temporary material has been removed, the edges shall be painted with an asphalt emulsion prior to the placement of the permanent pavement.
(C) Hot laid bituminous concrete shall be placed in two courses when the extent of the job warrants at the discretion of the Director or his or her agent, so as to give a two and one-half inch compacted surface or a surface that has a depth equal to the existing street surface, whichever is greater.
(D) Compaction shall be made with a power driven roller, as directed by the Director of Public Works or his or her agent. The finished surface shall be free from waves or depressions and proper grade to existing surface.
(Ord. passed 8-15-1977)