1145.04 PROCEDURE.
   Applications for a planned development shall be filed with the Zoning Administrator. An application shall be complete prior to being scheduled for a public hearing. An application will be considered complete only if the Zoning Administrator is satisfied that all of the materials required by this chapter are included and are sufficient in their content to satisfy the intent of the application requirements.
   (a)   Pre-application Conference. Prior to filing a formal application for approval of planned development, the developer shall request a pre-application conference with the Zoning Administrator. The purpose of such conference is to allow the developer to present a general concept of this proposed development prior to the preparation of detailed plans. For this purpose, the presentation shall include, but not be limited to, the following:
      (1)   Written letter of intent from the developer establishing developer's intentions as to development of the land.
      (2)   Topographic survey and location map.
      (3)   Sketch plans and ideas regarding water supply, sewage disposal, surface drainage, and street improvements.
      (4)   The Zoning Administrator shall advise the developer of applicable zoning requirements and Comprehensive Plan elements and the procedural steps for approval. (Ord. 3520. Passed 3-19-19.)