§ 94.056 MINIMUM BONDING AMOUNTS.
   The minimum bonding amounts are as follows:
Utility annual permit bond
$25,000
Underground linear construction, grading, trenching, or excavation parallel to the road
$10,000 per mile or fraction of a mile (maximum $15,000)
Open road cut (paved)
$15,000 per location
Open road cut (gravel)
$0 per location
Bores or pushes under roadway
$5,000 per bore
Placement/removal of poles/overhead lines
$5,000 per mile or fraction of a mile (maximum $15,000)
Tap pit (including a directly associated push or bore)
$5,000 per pit
Equipment crossing subdivision curbs and sidewalk, no excavation
$2,000 per crossing
 
(Ord. 2020-0056, passed 11-2-2020)