13-2-26: Y:
YARD: The lot area between lot lines and the building area.
YARD, FRONT: The area between the front lot line and the building line extending the full width of the lot. The front yard shall be the area between the front line which primary access is taken and the building setback line. On a corner lot there shall be two (2) front yards.
YARD, REAR: The area between the rear lot line and the building area extending the full width of the lot. The rear setback area.
YARD, SIDE: The side setback area between the side lot lines and the building area, extending the full length of the building area. On corner lots the side yard is that which is opposite from the front yard except when a corner lot is also a through lot, then the side yard shall be the area along the interior side lot line. (Ord. 792, 7-29-2004; amd. Ord. 2021-1073, 3-10-2021)