11-1-8: REQUIRED LAND IMPROVEMENTS:
Unless waived or modified by the planning and zoning commission, no final plat shall be approved by the council without receiving a statement from the planning and zoning commission that the improvements described in the plans and specifications of the subdivider meet the minimum requirements of the laws of the city, and that they comply with the following:
   A.   Streets:
      1.   Surfacing: All streets shall be surfaced in accordance with applicable paving standard specifications of the city.
      2.   Curbs, Gutters And Drainage: Curbs, gutters, drainage and drainage structures shall be provided in accordance with standard specifications of the city.
      3.   Sidewalks: Concrete sidewalks shall be constructed along at least one side of every minor street shown on the plat in accordance with the applicable standard specifications of the city and concrete sidewalks shall be constructed along both sides of all arterial and collector streets.
      4.   Name Signs: Street name signs shall be placed at all street intersections within or abutting the subdivision.
      5.   Lighting: The minimum requirements for street lighting facilities shall be one 2500-lumen light, or equal, at each street intersection within or abutting the subdivision and every two hundred feet (200') within the subdivision with not less than a one hundred fifty (150) watt metal halide or sodium vapor light.
   B.   Water Supply:
      1.   Connection: Where public water supply approved by the city is reasonably accessible and in accordance with title 9, chapter 12 of this code, each lot within the subdivision shall be provided with a connection thereto.
      2.   Wells Or Private Water Supply: In a proposed subdivision, pending accessibility of a public water supply, the subdivider may be required to construct wells or a private water supply system in such a manner that an adequate supply of potable water will be available to every lot in the subdivision at the time improvements are erected thereon.
      3.   Fire Hydrants: Fire hydrants shall be installed in all subdivisions placed not more than three hundred feet (300') apart 1 .
      4.   Water Mains: Water mains shall be constructed in accordance with a design which has been reviewed and approved by the division of environmental quality and the city. Water mains shall be extended to the boundaries of the subdivision tract to permit possible future extensions 2 .
   C.   Sewers 3 :
      1.   Connection: Where a public sanitary sewer is reasonably accessible, each lot within the subdivided area shall be provided with a connection thereto.
      2.   Sewer Mains: Sewer mains shall be constructed in accordance with a design which has been reviewed and approved by the division of environmental quality and the city of Orofino. Sewer mains shall be extended to the boundaries of the subdivision tract to permit possible future extensions. (Ord. 786, 3-8-2016)

 

Notes

1
1. See also subsection 9-12-38F of this code.
2
2. See title 9, chapter 12 of this code.
3
3. See title 8, chapter 2 of this code.