9-12-39: AS-BUILT DRAWINGS AND ENGINEER'S CERTIFICATION:
   A.   Copies To City: As-built or record drawings of water main plans shall be prepared by a professional engineer and the "corrected" original drawing or a duplicate mylar copy of the "corrected" original drawing(s) shall be provided to the City.
   B.   Certification Required: As-built plans shall include a certification thereon signed by the registered professional engineer in charge of the work that the as-built drawings are true and correct and that he/she (the registered professional engineer) has inspected the construction of the water system installation and that the materials and installation of same were all done in conformance with the City standard specifications for water system construction. (Ord. 659, 9-27-1994)