8-2-35: SEWER SYSTEM MATERIALS AND INSTALLATIONS:
   A.   Compliance: All sanitary sewer main line and storm drain main line materials, manholes, etc., and their installation shall be in accordance with city standard specifications for the construction of sanitary sewers and storm sewers and the applicable standard drawings depicting various sewer line installation details.
   B.   Acceptable Materials: All sewer system materials shall be of the class, strength, thickness, etc., necessary to accommodate or provide for the depth of cover over the pipe, the type of material and bedding around the pipe, and the type, magnitude and extent of the external loads being applied to the pipe.
   C.   Approval By City: All materials must be approved by the City. (Ord. 655, 9-27-1994)