5-2-8-1: WATER FEES:
   Each applicant shall pay the following fees to the Village at the time of application for a permit, if water and
   sewer service connections are required and shall be a part of the construction proposed:
   a.   Each dwelling unit, single or multi-family, shall have a 1 inch meter and fittings ------------------------------------- $397.00 (Ord. 3819, 10-6-03)
      This fee may be adjusted due to Village costs of meters by suppliers.
   b.   Water meter costs larger than 1 inch shall be as provided by the Water Department. (Ord. 3819, 10-6-03)
   c.   Water connection (tap-ons) shall be as follows:
Tap Size
Fire Demand Factors*
Tap Fee
Meter Size
Meter Demand Factors**
Meter Fee Per Meter
Tap Size
Fire Demand Factors*
Tap Fee
Meter Size
Meter Demand Factors**
Meter Fee Per Meter
3/4"
1.6
$ 363
3/4"
1.0
$ 3,537
1"
2.6
$ 590
1"
2.5
$ 5,109
1 1/2"
2.9
$ 658
1 1/2"
5.0
$ 10,218
2"
6.19
$ 1,406
2"
8.0
$ 16,348
3"
17.98
$ 4,083
3"
16.0
$ 32,697
4"
38.32
$ 8,701
4"
25.0
$ 51,089
6"
111.31
$ 25,274
 
 
8" or over
237.21
$ 53,861
 
 
 
*Fire Demand Factors - AWWA Manual M1 Table 30-5 page 224
**Meter Demand Factors - AWWA Manual M1 Table 28-2 page 202
(Ord. 4378, 6-16-08)
   For tap sizes over six inches (6"), the connection charge shall be negotiated and agreed upon between the applicant and the Board of Trustees, but it shall not be less than the minimum charge for a six inch (6") tap and one inch (1") meter set. The Village Engineer shall make a recommendation as per the Village Water Purveyor.
   d.   If a larger meter set is added after the initial permit is issued, the difference between the smaller and larger meter shall be due upon installation of the larger meter.
(See Ord. 3587 Sec. 9, 1-21-02 - above paragraph and item 6 are not to be deleted)
   e.   An applicant for a permit for a new water tap or to modify an existing lawn irrigation water system that was installed and for which a permit was issued prior to January 1, 2017, in order for the new system to operate independently from the existing system, shall not be required to pay the above scheduled Meter Fee Per Meter fee. (Ord. 5160, 1-16-17)