5-2-7-1: FIXED FEE PERMITS (small improvements):
   For installation of an approved rain detection devise on an existing lawn sprinkler system without such a device, a permit must be obtained, but there shall be no permit fee. For miscellaneous construction as listed below, the fee shall be $75.00 or as listed. (Ord. 3704, 11-4-02; Amd. Ord. 3819, 10-6-03; Amd. Ord. 3911, 7-19-04; Amd. Ord. 4614, 1-17-11; Amd. Ord. 5247, 12-4-17)
   Fixed Fees Table
Inspection Type
# Inspections
Fee
Plan Review
Total
Inspection Type
# Inspections
Fee
Plan Review
Total
1
Concrete & brick patios, stoops, steps (installation and repair)
2 (pre-pour & final)
$75.00 ea.
N.A.
$150.00
2
Deck (proposed & replace)
3
(pre-pour, rough & final)
$75.00 ea.
$125.00
$350.00
3
Deck (Repair) (gaurdrails, decking only)
1 (final)
$75.00
N.A.
$75.00
3.1
Deck (Repair) (Joist, girders, columns)
2 (rough & final)
$75.00 ea.
N.A.
$150.00
4
Shed
2 (pre-pour & final)
$75.00 ea.
N.A.
$150.00
5.1
Install above ground pool
1 (final)
$100.00
N.A.
$100.00
5.2
If electric heater added
2 (underground, final)
$75.00 ea.
$175.00
5.3
Demolition of existing pools (above grade)
1 (final)
$75.00
N.A.
$75.00
5.4
Demolition of existing pools (below grade)
1 (final)
$90.00
N.A.
$90.00
6
Fence
1 (final)
$100.00
N.A.
$100.00
7
Driveway
1 (final) & (base)
$75.00
N.A.
$150.00
8
Roof (New or reroof)
1 (final)
$75.00
N.A.
$75.00
Note
Village inspectors provide final inspection only. IBC section 110.1 does not require roof installation inspections in terms of attachment or fasteners.
9
HVAC equipment
(individual dwelling units)
9.1
Furnace (including multifamily)
1 (final)
$75.00
N.A.
$75.00
9.2
Air conditioner (including multifamily)
1 (final)
$75.00
N.A.
$75.00
9.3
Furnace & Air conditioner (same permit) (including multifamily)
1 (final)
$125.00
N.A.
$125.00
9.4
Duct extensions & modifications
1 (rough)
$75.00
N.A.
$75.00
10
Security alarms (Wired)
1 (final)
$75.00
N.A.
$75.00
11
Water Heater
1 (final)
$75.00
N.A.
$75.00
12
Windows & Doors
1 (final)
$75.00
N.A.
$75.00
13
Siding / Exterior finishes
1 (final)
$75.00
N.A.
$75.00
14
Private sidewalks
1 (prepour)
$75.00
N.A.
$75.00
14.1
Commercial sidewalks
1 (prepour)
$1.00/ linear foot
N.A.
Computed
15
Gazebo, trellis, pergola
2 (Rough & final)
$75.00 ea.
$125.00
$275.0 0
Note a
If foundation / piers added
1 pre-pour
$75.00
-----
$75.00
Note b
If light framed stick built (non pre-assembled)
3 (prepour, rough, final)
$75.00 each
$125.00
$350.00
16
Plumbing fixture no plans-commercial
2
$90.00 ea.
-----
$180.00
16.1
Plumbing fixture no plans - residential
2
$75.00 ea.
-----
$150.0 0
16.2
Commercial hot water heaters
1
90.00
-----
$90.00
17
Retaining wall
2 (pre-pour & final)
$75.00 ea.
N.A.
$150.00
17.1
> 3' in height (engineering plans required)
2 (pre-pour & final)
$75.00 ea.
$125.00
$275.00
18
Subsurface drain tile
1
$75.00
N.A.
$75.00
18.1
Subsurface drain tile ties to Village infrastructure
2 (Rough & Final)
$150.00
N.A.
$150.00
19.0
Commercial building reviews (No plans)
1
$90.00
$90.00
$180.00
 
   a.   Concrete patio, stoop, steps - - installation or repair;
   b.   Deck;
   c.   Shed;
   d.   Above-ground pool; (See 5-2-7-10 (I.) for In-Ground Pools) (Ord. 3819, 10-6-03)
   e.   Fence;
   f.   Single-family residential driveway;
   g.   Roof shingle replacement;
   h.   Temporary structures, i.e. tents (these may also require health inspections, where food preparation will be involved. Additional health fees shown in 5-2-7-9 shall also apply to tent permits).
(Ord. 3819, 10-6-03; Amd. Ord. 5247, 12-4-17; Amd. Ord. 5293, 4- 16-18; Amd. Ord. 5342, 10-15-18)