a. New Single Family Residence ----------------------------------------------------------------------------------------------------$420.00
(Ord. 3819, 10-6-03; Amd. Ord. 3911, 7-19-04; Amd. Ord. 5247, 12-4-17)
b. New Single Family Residential energy reviews required per Illinois Code ----------------------------------------------------$75.00
(Ord. 4614, 1-17-11)
c. Single Family Additions and remodeling, when adding less than 50% to the floor area of the residence -------------------- $150.00
(Ord. 3819, 10-6-03; Amd. Ord. 3911, 7-19-04; Amd. Ord. 5247, 12-4-17)
c. 1. Plan reviews for interior alteration to single family, attached single family and multifamily residential units with alterations / renovation area < 200 sq.ft. total ------------------------------------------------------------------------------------------------------------------------------------------------------------$75.00
Note: All required plumbing, mechanical, electrical and building inspection fees remain as scheduled in this chapter.
(Amd. Ord. 5293, 4-16-18)
d. Single Family Addition energy reviews per state of Illinois Code ---------------------------------------------------------------- $75.00
(Ord. 4614, 1-17-11; Amd. Ord. 5247, 12-4-17)
e. Commercial construction, including remodeling for tenant spaces. (see note):
Volume (cubic feet) | Basic Review |
0 through 20,000 | $220.00 |
20,001 - - - - 40,000 | $318.00 |
40,001 - - - - 60,000 | $420.00 |
60,001 - - - - 80,000 | $528.00 |
80,001 - - - - 100,000 | $630.00 |
100,001 - - - 150,000 | $732.00 |
150,001 - - - 200,000 | $912.00 |
Over 200,000 - - - - | $912.00 plus $15.00 per each 10,000 cu. ft Over 200,000 cu. ft. |
(Ord. 3819, 10-6-03; Amd. Ord. 3911, 7-19-04; Amd. Ord. 5247, 12-4-17; Amd. Ord. 5293, 4-16-18)
Note:
• Assembly, Institutional and Mall building reviews are 1.5 times the base fee schedule.
• Electrical, Plumbing, Mechanical, Energy, Accessibility, Health and Fire Code (Table f.) review fees (when required) are each 30% of a building plan review fee but not less than $125.00 each.
• Minimum plan review fee for commercial permits/projects submitted not requiring plans shall be min. $180.00.
(Ord. 3450, 12-4-00; Amd. Ord. 3911, 7-19-04; Amd. Ord. 4614, 1/17/11; Amd. Ord. 5247, 12-4-17; Amd. Ord. 5293, 4-16-18; Amd. Ord. 5342, 10-15-18)
f. Fire Sprinkler Plan Review Fee:
Number of Sprinkler Heads | Review Fees |
0 - 25 | $150.00 |
25 - 50 | $200.00 |
51 - 100 | $350.00 |
Over 100 | $1.00/sprinkler head over 100 heads |
Fire Pumps | $90.00 per pump |
Standpipe systems | $90.00 per each vertical or horizontal standpipe |
(Ord. 4614, 1/17/11; Amd. Ord. 5247, 12-4-17; Amd. Ord. 5293, 4-16-18)
f1. Fire Alarm Plan Review Fee:
Square Feet | Review Fees |
0 - 10,000 | $250.00 |
For ea. additional 10,000 sq. ft. | $150.00 |
(Ord. 4614, 1/17/11; Amd. Ord. 5247, 12-4-17)
f2. Kitchen Hood, Duct and Suppression Plan Review Fee ----------------------------- $200.00 per system
or 12' of hood length.
f3. High Piled Rack Storage with a product height over twelve feet (12')
Plan Review Fee --------------------------------------------------------------------------------------- $200.00
f4. Hazardous Materials Plan Review Fee ----------------------------------------------------------- $200.00
f4.1 Hazardous Material Inspection Fee --------------------------------------------------------------- $90.00
f5. Miscellaneous Fire Plan Review Fee: (Includes Spray Booths and
Clean Agent Systems) -------------------------------------------------------------------------------- $200.00
f6. Field Inspections, Maintenance and Acceptance Testing of Fire protection Systems shall be by the appropriate Fire Protection District.
f7. LP-gas containers awaiting use or resale Plan Review Fee: -------------------------------- $90.00
f7.1 LP-gas containers awaiting use or resale Inspection Fee: ----------------------------------- $90.00
f7.2 Annual permit required for LP-gas containers/ or lockers use or resale: ------------ $90.00/container
(Ord. 4491, 6-15-09; Amd. Ord. 4614, 1-17-11; Amd. Ord. 5247, 12-4-17; Amd. Ord. 5293, 4-16-18)