4-9-1: CONNECTION FEE:
   Whenever any lands included in zoning districts pursuant to the Land Development Code of the Village and being the subject matter of a plat of subdivision or plat of resubdivision or a plat of a planned unit development or plat of commercial or industrial development are to be served by the Village combined waterworks and sewerage system, a connection fee thereto shall be paid to the Village by a developer, determined as follows:
   Attached Single-Family Residential Construction and Townhomes: A connection fee of $1,350.00 per dwelling unit contained in an attached single-family residence and townhome construction shall be payable to the Village in the manner prescribed herein. The number of dwelling units shall be determined by those delineated on the plat.
   Detached Single-Family Residential Construction: A connection fee of eighteen hundred dollars ($1,800.00) per single-family residence to be constructed shall be payable to the Village in that manner prescribed herein.
   Multi-Family Residential Construction: A connection fee of nine hundred fifty dollars ($900.00) per dwelling unit contained in a multi-family development shall be payable to the Village in the manner prescribed herein. The number of dwelling units shall be determined by those units delineated on the plat.
   In determining the number of acres for purposes of calculating the total number of units that acreage used for a water retention or detention basin to serve the multi-family units, shall not be included.
   Commercial and Industrial Development: For commercial and industrial developers, a connection fee shall be charged to the development in accord with the following formula:
   One dollar fifty cents ($1.50) per the average number of gallons of water used daily during the first year of full occupancy of the development. Such connection fee shall be payable to the Village.
   In calculating that portion of the connection fee based on average daily gallons of usage of water, the following procedure shall be used: An estimated connection fee shall be calculated based on estimated average daily gallon usage of water. The estimate of average daily gallon usage shall be made by the Water and Sewerage Department in accord with those figures set forth in the following table. Seventy five percent (75%) of the estimated connection fee shall be the amount to be paid. After the commercial or industrial development has been fully occupied for a year, the actual average daily gallon usage of water will be determined and the actual fee determined. If the actual fee exceeds seventy five percent (75%) of the estimated connection fee, said difference shall be paid to the Village. If the seventy five percent (75%) of the estimated connection fees exceed the actual fee, the difference shall be refunded to, the developer.
 
Estimate Average Gallons
Zoning District
Used Per day Per Acre
BIZ
1,250 gallons
MFG
2,500 gallons
 
   Average number of gallons for a development shall be determined by multiplying the number of acres by the above estimated average gallons used per day per acre.