4-6-3: APPLICATION FOR CONNECTIONS:
   Applicants for sewer connections and/or house connections shall pay all costs of labor and materials for installing the sewer connections, except in those instances where the sewer connection has been installed by the Village prior to June 1, 1965, and shall in all cases pay all costs of labor and materials for installing the house connection, and installation may be made only after issuance by the President and Board of Trustees of a permit authorizing the sewer connection and house connection and specifying the size, grade and materials thereof. Such application for sewer connection and/or house connections shall impose liability for a periodic sewer charge to be billed the owner not later than ninety (90) days after service is available to the owner's premises, whether or not said owner makes physical connection to said sanitary sewerage system.
   Whenever after June 1, 1965, the Village shall install a sewer connection, the cost of installation of such connection shall be paid to the Village by the applicant at the time that application is made for connection to the sanitary sewer system. The Village Treasurer shall keep a record of the cost of each such sewer connection. (Ord. 305, 6-14-65)